<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>86687</law_id><section_number>62.1-44.15:26.1</section_number><catch_line>Termination of Construction General Permit coverage</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><structure><unit label="title" level="1" order_by="1" identifier="62.1">Waters of the State, Ports and Harbors</unit><unit label="chapter" level="2" order_by="1" identifier="3.1">State Water Control Law</unit><unit label="article" level="3" order_by="1" identifier="2.3">Virginia Erosion and Stormwater Management Act (VESMA)</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> A <span class="dictionary">VSMP authority</span> shall recommend that the <span class="dictionary">Department</span> of Environmental Quality terminate coverage under a General <span class="dictionary">Permit</span> for Discharges of Stormwater from Construction Activities (Construction General <span class="dictionary">Permit</span>) within 60 days of receiving a complete notice of termination from the operator of the construction activity. <a id="paragraph-310454" class="section-permalink" href="https://vacode.org/62.1-44.15_26.1/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> Coverage under a Construction General <span class="dictionary">Permit</span> shall be deemed to be terminated 90 days after the receipt by the <span class="dictionary">VSMP authority</span> of a complete notice of termination from the operator of the construction activity. <a id="paragraph-310455" class="section-permalink" href="https://vacode.org/62.1-44.15_26.1/#B"><i class="fa fa-link"/></a></p></section>
						<section id="C"><p><span class="prefix-number">C.</span> If a <span class="dictionary">VSMP authority</span> receives a notice of termination of a Construction General <span class="dictionary">Permit</span> that it determines to be incomplete, the <span class="dictionary">VSMP authority</span> shall, within a reasonable time, inform the operator of the construction activity of such incompleteness and provide the operator with a detailed list itemizing the elements of information that are missing from the notice. <a id="paragraph-310456" class="section-permalink" href="https://vacode.org/62.1-44.15_26.1/#C"><i class="fa fa-link"/></a></p></section></text><history>2018, c. 630.</history><metadata></metadata></law>
