<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>87045</law_id><section_number>62.1-44.15:34</section_number><catch_line>Regulated activities; submission and approval of a permit application; security for performance; exemptions</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><referred_to_by><reference>33.2-332</reference><reference>62.1-44.15:27</reference><reference>62.1-44.15:27.3</reference><reference>62.1-44.15:27.4</reference><reference>62.1-44.15:31</reference><reference>62.1-44.15:33</reference><reference>62.1-44.15:52</reference><reference>62.1-44.3</reference></referred_to_by><structure><unit label="title" level="1" order_by="1" identifier="62.1">Waters of the State, Ports and Harbors</unit><unit label="chapter" level="2" order_by="1" identifier="3.1">State Water Control Law</unit><unit label="article" level="3" order_by="1" identifier="2.3">Virginia Erosion and Stormwater Management Act (VESMA)</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> A <span class="dictionary">person</span> shall not conduct any <span class="dictionary">land-disturbing activity</span> until (i) he has submitted to the appropriate <span class="dictionary">VESMP authority</span> an application that includes a <span class="dictionary">permit</span> registration statement, if required, a <span class="dictionary">soil erosion control and <span class="dictionary">stormwater management plan</span></span> or an executed <span class="dictionary">agreement in lieu of a plan</span>, if required, and (ii) the <span class="dictionary">VESMP authority</span> has issued its <span class="dictionary">land-disturbance approval</span>. In addition, as a prerequisite to engaging in an approved <span class="dictionary">land-disturbing activity</span>, the name of the individual who will be assisting the <span class="dictionary">owner</span> in carrying out the activity and holds a Responsible Land Disturber <span class="dictionary">certificate</span> pursuant to &#xA7;&#xA0;<a class="law" title="Training and certification" href="/62.1-44.15_30/">62.1-44.15:30</a> shall be submitted to the <span class="dictionary">VESMP authority</span>. Any <span class="dictionary">VESMP authority</span> may <span class="dictionary">waive</span> the Responsible Land Disturber <span class="dictionary">certificate</span> requirement for an <span class="dictionary">agreement in lieu of a plan</span>; however, if a violation occurs during the <span class="dictionary">land-disturbing activity</span>, then the <span class="dictionary">owner</span> shall correct the violation and provide the name of the individual holding a Responsible Land Disturber <span class="dictionary">certificate</span> as provided by &#xA7;&#xA0;62.1-14:30. Failure to provide the name of an individual holding a Responsible Land Disturber <span class="dictionary">certificate</span> prior to engaging in land-disturbing activities may result in <span class="dictionary">revocation</span> of the <span class="dictionary">land-disturbance approval</span> and shall subject the <span class="dictionary">owner</span> to the penalties provided in this article. <a id="paragraph-311692" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#A"><i class="fa fa-link"/></a></p></section>
						<section id="A1" class="indent-1"><p><span class="prefix-number">1.</span> A <span class="dictionary">VESMP authority</span> that is implementing its program pursuant to subsection A of &#xA7; <a class="law" title="Virginia Programs for Erosion Control and Stormwater Management" href="/62.1-44.15_27/">62.1-44.15:27</a> or <span class="dictionary">subdivision</span> B 1 of &#xA7; <a class="law" title="Virginia Programs for Erosion Control and Stormwater Management" href="/62.1-44.15_27/">62.1-44.15:27</a> shall determine the completeness of any application within 15 days after receipt, and shall act on any application within 60 days after it has been determined by the <span class="dictionary">VESMP authority</span> to be complete. The <span class="dictionary">VESMP authority</span> shall <span class="dictionary">issue</span> either <span class="dictionary">land-disturbance approval</span> or denial and provide written rationale for any denial. Prior to issuing a <span class="dictionary">land-disturbance approval</span>, a <span class="dictionary">VESMP authority</span> shall be required to obtain <span class="dictionary">evidence</span> of <span class="dictionary">permit</span> coverage when such coverage is required. The <span class="dictionary">VESMP authority</span> also shall determine whether any resubmittal of a previously disapproved application is complete within 15 days after receipt and shall act on the resubmitted application within 45 days after receipt. <a id="paragraph-311693" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#A1"><i class="fa fa-link"/></a></p></section>
						<section id="A2" class="indent-1"><p><span class="prefix-number">2.</span> A <span class="dictionary">VESMP authority</span> implementing its program in coordination with the <span class="dictionary">Department</span> pursuant to <span class="dictionary">subdivision</span> B 2 of &#xA7; <a class="law" title="Virginia Programs for Erosion Control and Stormwater Management" href="/62.1-44.15_27/">62.1-44.15:27</a> shall determine the completeness of any application within 15 days after receipt, and shall act on any application within 60 days after it has been determined by the <span class="dictionary">VESMP authority</span> to be complete. The <span class="dictionary">VESMP authority</span> shall forward a <span class="dictionary">soil erosion control and <span class="dictionary">stormwater management plan</span></span> to the <span class="dictionary">Department</span> for review within five days of receipt. If the plan is incomplete, the <span class="dictionary">Department</span> shall return the plan to the locality immediately and the application process shall start over. If the plan is complete, the <span class="dictionary">Department</span> shall review it for compliance with the water quality and <span class="dictionary">water quantity technical criteria</span> and provide its recommendation to the <span class="dictionary">VESMP authority</span>. The <span class="dictionary">VESMP authority</span> shall either (i) <span class="dictionary">issue</span> the <span class="dictionary">land-disturbance approval</span> or (ii) <span class="dictionary">issue</span> a denial and provide a written rationale for the denial. In no case shall a locality have more than 60 days for its decision on an application after it has been determined to be complete. Prior to issuing a <span class="dictionary">land-disturbance approval</span>, a <span class="dictionary">VESMP authority</span> shall be required to obtain <span class="dictionary">evidence</span> of <span class="dictionary">permit</span> coverage when such coverage is required.
				The <span class="dictionary">VESMP authority</span> also shall forward to the <span class="dictionary">Department</span> any resubmittal of a previously disapproved application within five days after receipt, and the <span class="dictionary">VESMP authority</span> shall determine whether the plan is complete within 15 days of its receipt of the plan. The <span class="dictionary">Department</span> shall review the plan for compliance with the water quality and <span class="dictionary">water quantity technical criteria</span> and provide its recommendation to the <span class="dictionary">VESMP authority</span>, and the <span class="dictionary">VESMP authority</span> shall act on the resubmitted application within 45 days after receipt. <a id="paragraph-311694" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#A2"><i class="fa fa-link"/></a></p></section>
						<section id="A3" class="indent-1"><p><span class="prefix-number">3.</span> When a state agency or federal entity submits a <span class="dictionary">soil erosion control and <span class="dictionary">stormwater management plan</span></span> for a project, <span class="dictionary">land disturbance</span> shall not commence until the <span class="dictionary">Board</span> has reviewed and approved the plan and has issued <span class="dictionary">permit</span> coverage when it is required.
				a. The <span class="dictionary">Board</span> shall not approve a <span class="dictionary">soil erosion control and <span class="dictionary">stormwater management plan</span></span> submitted by a state agency or federal entity for a project involving a <span class="dictionary">land-disturbing activity</span> (i) in any locality that has not adopted a local program with more stringent <span class="dictionary">ordinances</span> than those of the state program or (ii) in multiple <span class="dictionary">jurisdictions</span> with separate local programs, unless the plan is consistent with the requirements of the state program.
				b. The <span class="dictionary">Board</span> shall not approve a <span class="dictionary">soil erosion control and <span class="dictionary">stormwater management plan</span></span> submitted by a state agency or federal entity for a project involving a <span class="dictionary">land-disturbing activity</span> in one locality with a local program with more stringent <span class="dictionary">ordinances</span> than those of the state program, unless the plan is consistent with the requirements of the local program.
				c. If onsite changes occur, the state agency or federal entity shall submit an amended <span class="dictionary">soil erosion control and <span class="dictionary">stormwater management plan</span></span> to the <span class="dictionary">Department</span>.
				d. The state agency or federal entity responsible for the <span class="dictionary">land-disturbing activity</span> shall ensure compliance with the approved plan. As necessary, the <span class="dictionary">Board</span> shall provide project oversight and enforcement. <a id="paragraph-311695" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#A3"><i class="fa fa-link"/></a></p></section>
						<section id="A4" class="indent-1"><p><span class="prefix-number">4.</span> Prior to issuance of any <span class="dictionary">land-disturbance approval</span>, the <span class="dictionary">VESMP authority</span> may also require an <span class="dictionary">applicant</span>, excluding state agencies and federal entities, to submit a reasonable performance <span class="dictionary">bond</span> with <span class="dictionary">surety</span>, cash escrow, letter of credit, any combination thereof, or such other legal arrangement acceptable to the <span class="dictionary">VESMP authority</span>, to ensure that measures could be taken by the <span class="dictionary">VESMP authority</span> at the <span class="dictionary">applicant</span>&#x2019;s expense should he fail, after proper notice, within the time specified to comply with the conditions imposed by the <span class="dictionary">VESMP authority</span> as a result of his <span class="dictionary">land-disturbing activity</span>. If the <span class="dictionary">VESMP authority</span> takes such action upon such failure by the <span class="dictionary">applicant</span>, the <span class="dictionary">VESMP authority</span> may collect from the <span class="dictionary">applicant</span> the difference should the amount of the reasonable cost of such action exceed the amount of the security held. Within 60 days of the completion of the <span class="dictionary">VESMP authority</span>&#x2019;s conditions, such <span class="dictionary">bond</span>, cash escrow, letter of credit, or other legal arrangement, or the unexpended or unobligated portion thereof, shall be refunded to the <span class="dictionary">applicant</span> or terminated. <a id="paragraph-311696" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#A4"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> The <span class="dictionary">VESMP authority</span> may require changes to an approved <span class="dictionary">soil erosion control and <span class="dictionary">stormwater management plan</span></span> in the following cases: <a id="paragraph-311697" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#B"><i class="fa fa-link"/></a></p></section>
						<section id="B1" class="indent-1"><p><span class="prefix-number">1.</span> Where inspection has revealed that the plan is inadequate to satisfy applicable <span class="dictionary">regulations</span> or <span class="dictionary">ordinances</span>; or <a id="paragraph-311698" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#B1"><i class="fa fa-link"/></a></p></section>
						<section id="B2" class="indent-1"><p><span class="prefix-number">2.</span> Where the <span class="dictionary">owner</span> finds that because of changed circumstances or for other reasons the plan cannot be effectively carried out, and proposed amendments to the plan, consistent with the requirements of this article, are agreed to by the <span class="dictionary">VESMP authority</span> and the <span class="dictionary">owner</span>. <a id="paragraph-311699" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#B2"><i class="fa fa-link"/></a></p></section>
						<section id="C"><p><span class="prefix-number">C.</span> In <span class="dictionary">order</span> to prevent further erosion, a <span class="dictionary">VESMP authority</span> may require approval of a <span class="dictionary">soil erosion control and <span class="dictionary">stormwater management plan</span></span> for any land identified as an <span class="dictionary">erosion impact area</span> by the <span class="dictionary">VESMP authority</span>. <a id="paragraph-311700" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#C"><i class="fa fa-link"/></a></p></section>
						<section id="D"><p><span class="prefix-number">D.</span> A <span class="dictionary">VESMP authority</span> may enter into an agreement with an adjacent <span class="dictionary">VESMP authority</span> regarding the administration of multijurisdictional projects, specifying who shall be responsible for all or part of the administrative procedures. Should adjacent VESMP authorities fail to reach such an agreement, each shall be responsible for administering the area of the multijurisdictional project that lies within its <span class="dictionary">jurisdiction</span>. <a id="paragraph-311701" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#D"><i class="fa fa-link"/></a></p></section>
						<section id="E"><p><span class="prefix-number">E.</span> The following requirements shall apply to land-disturbing activities in the Commonwealth: <a id="paragraph-311702" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#E"><i class="fa fa-link"/></a></p></section>
						<section id="E1" class="indent-1"><p><span class="prefix-number">1.</span> Any <span class="dictionary">land-disturbing activity</span> that (i) disturbs one acre or more of land or (ii) disturbs less than one acre of land and is part of a larger common plan of development or sale that results in one acre or greater of <span class="dictionary">land disturbance</span> may, in accordance with <span class="dictionary">regulations</span> adopted by the <span class="dictionary">Board</span>, be required to obtain <span class="dictionary">permit</span> coverage. <a id="paragraph-311703" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#E1"><i class="fa fa-link"/></a></p></section>
						<section id="E2" class="indent-1"><p><span class="prefix-number">2.</span> For a <span class="dictionary">land-disturbing activity</span> occurring in an area not designated as a Chesapeake Bay Preservation Area subject to the Chesapeake Bay Preservation Act (&#xA7; <a class="law" title="Cooperative state-local program" href="/62.1-44.15_67/">62.1-44.15:67</a> et seq.):
				a. Soil erosion control requirements and <span class="dictionary">water quantity technical criteria</span> adopted pursuant to this article shall apply to any activity that disturbs 10,000 square feet or more, although the locality may reduce this regulatory threshold to a smaller area of disturbed land. A plan addressing these requirements shall be submitted to the <span class="dictionary">VESMP authority</span> in accordance with subsection A. This <span class="dictionary">subdivision</span> shall also apply to additions or modifications to existing single-family detached residential structures.
				b. Soil erosion control requirements and water quantity and <span class="dictionary">water quality technical criteria</span> shall apply to any activity that (i) disturbs one acre or more of land or (ii) disturbs less than one acre of land and is part of a larger common plan of development or sale that results in one acre or greater of <span class="dictionary">land disturbance</span>, although the locality may reduce this regulatory threshold to a smaller area of disturbed land. A plan addressing these requirements shall be submitted to the <span class="dictionary">VESMP authority</span> in accordance with subsection A. <a id="paragraph-311704" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#E2"><i class="fa fa-link"/></a></p></section>
						<section id="E3" class="indent-1"><p><span class="prefix-number">3.</span> For a <span class="dictionary">land-disturbing activity</span> occurring in an area designated as a Chesapeake Bay Preservation Area subject to the Chesapeake Bay Preservation Act (&#xA7; <a class="law" title="Cooperative state-local program" href="/62.1-44.15_67/">62.1-44.15:67</a> et seq.):
				a. Soil erosion control and water quantity and <span class="dictionary">water quality technical criteria</span> shall apply to any <span class="dictionary">land-disturbing activity</span> that disturbs 2,500 square feet or more of land, other than a single-family detached residential structure. However, the governing body of any affected locality may reduce this regulatory threshold to a smaller area of disturbed land. A plan addressing these requirements shall be submitted to the <span class="dictionary">VESMP authority</span> in accordance with subsection A.
				b. For land-disturbing activities for single-family detached residential structures, soil erosion control and <span class="dictionary">water quantity technical criteria</span> shall apply to any <span class="dictionary">land-disturbing activity</span> that disturbs 2,500 square feet or more of land, and the locality also may require compliance with the <span class="dictionary">water quality technical criteria</span>. A plan addressing these requirements shall be submitted to the <span class="dictionary">VESMP authority</span> in accordance with subsection A. <a id="paragraph-311705" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#E3"><i class="fa fa-link"/></a></p></section>
						<section id="F"><p><span class="prefix-number">F.</span> Notwithstanding any other provisions of this article, the following activities are not required to comply with the requirements of this article unless otherwise required by federal <span class="dictionary">law</span>: <a id="paragraph-311706" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#F"><i class="fa fa-link"/></a></p></section>
						<section id="F1" class="indent-1"><p><span class="prefix-number">1.</span> <span class="dictionary">Minor</span> land-disturbing activities, including home gardens and individual home landscaping, repairs, and maintenance work; <a id="paragraph-311707" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#F1"><i class="fa fa-link"/></a></p></section>
						<section id="F2" class="indent-1"><p><span class="prefix-number">2.</span> Installation, maintenance, or repair of any individual service connection; <a id="paragraph-311708" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#F2"><i class="fa fa-link"/></a></p></section>
						<section id="F3" class="indent-1"><p><span class="prefix-number">3.</span> Installation, maintenance, or repair of any underground utility line when such activity occurs on an existing hard surfaced road, street, or sidewalk, provided the <span class="dictionary">land-disturbing activity</span> is confined to the area of the road, street, or sidewalk that is hard surfaced; <a id="paragraph-311709" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#F3"><i class="fa fa-link"/></a></p></section>
						<section id="F4" class="indent-1"><p><span class="prefix-number">4.</span> Installation, maintenance, or repair of any septic tank line or drainage field unless included in an overall plan for <span class="dictionary">land-disturbing activity</span> relating to construction of the building to be served by the septic tank system; <a id="paragraph-311710" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#F4"><i class="fa fa-link"/></a></p></section>
						<section id="F5" class="indent-1"><p><span class="prefix-number">5.</span> Permitted surface or deep mining operations and projects, or oil and gas operations and projects conducted pursuant to Title 45.2; <a id="paragraph-311711" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#F5"><i class="fa fa-link"/></a></p></section>
						<section id="F6" class="indent-1"><p><span class="prefix-number">6.</span> Clearing of lands specifically for bona fide agricultural purposes; the management, tilling, planting, or harvesting of agricultural, horticultural, or forest crops; livestock feedlot operations; agricultural engineering operations, including construction of terraces, terrace outlets, check dams, desilting basins, dikes, ponds, ditches, strip cropping, lister furrowing, contour cultivating, contour furrowing, land drainage, and land irrigation; or as additionally set forth by the <span class="dictionary">Board</span> in <span class="dictionary">regulations</span>. However, this exception shall not apply to harvesting of forest crops unless the area on which harvesting occurs is reforested artificially or naturally in accordance with the provisions of Chapter 11 (&#xA7; <a class="law" title="Department of Forestry; appointment of the State Forester" href="/10.1-1100/">10.1-1100</a> et seq.) or is converted to bona fide agricultural or improved pasture use as described in subsection B of &#xA7; <a class="law" title="Exemptions from article" href="/10.1-1163/">10.1-1163</a>; <a id="paragraph-311712" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#F6"><i class="fa fa-link"/></a></p></section>
						<section id="F7" class="indent-1"><p><span class="prefix-number">7.</span> Installation of fence and sign posts or telephone and electric poles and other kinds of posts or poles; <a id="paragraph-311713" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#F7"><i class="fa fa-link"/></a></p></section>
						<section id="F8" class="indent-1"><p><span class="prefix-number">8.</span> Shoreline erosion control projects on tidal waters when all of the land-disturbing activities are within the regulatory authority of and approved by local <span class="dictionary">wetlands</span> <span class="dictionary">boards</span>, the Marine Resources Commission, or the United States Army Corps of Engineers; however, any associated land that is disturbed outside of this exempted area shall remain subject to this article and the <span class="dictionary">regulations</span> adopted pursuant thereto; <a id="paragraph-311714" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#F8"><i class="fa fa-link"/></a></p></section>
						<section id="F9" class="indent-1"><p><span class="prefix-number">9.</span> Repair or rebuilding of the tracks, rights-of-way, bridges, communication facilities, and other related structures and facilities of a railroad company; <a id="paragraph-311715" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#F9"><i class="fa fa-link"/></a></p></section>
						<section id="F10" class="indent-1"><p><span class="prefix-number">10.</span> Land-disturbing activities in response to a public emergency where the related work requires immediate authorization to avoid imminent endangerment to human health or the environment. In such situations, the <span class="dictionary">VESMP authority</span> shall be advised of the disturbance within seven days of commencing the <span class="dictionary">land-disturbing activity</span>, and compliance with the administrative requirements of subsection A is required within 30 days of commencing the <span class="dictionary">land-disturbing activity</span>; and <a id="paragraph-311716" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#F10"><i class="fa fa-link"/></a></p></section>
						<section id="F11" class="indent-1"><p><span class="prefix-number">11.</span> Discharges to a sanitary sewer or a combined sewer system that are not from a <span class="dictionary">land-disturbing activity</span>. <a id="paragraph-311717" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#F11"><i class="fa fa-link"/></a></p></section>
						<section id="G"><p><span class="prefix-number">G.</span> Notwithstanding any other provision of this article, the following activities are required to comply with the soil erosion control requirements but are not required to comply with the water quantity and <span class="dictionary">water quality technical criteria</span>, unless otherwise required by federal <span class="dictionary">law</span>: <a id="paragraph-311718" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#G"><i class="fa fa-link"/></a></p></section>
						<section id="G1" class="indent-1"><p><span class="prefix-number">1.</span> Activities under a state or federal <span class="dictionary">reclamation</span> program to return an abandoned property to an agricultural or open land use; <a id="paragraph-311719" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#G1"><i class="fa fa-link"/></a></p></section>
						<section id="G2" class="indent-1"><p><span class="prefix-number">2.</span> Routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original construction of the project. The paving of an existing road with a compacted or impervious surface and reestablishment of existing associated ditches and shoulders shall be deemed routine maintenance if performed in accordance with this subsection; and <a id="paragraph-311720" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#G2"><i class="fa fa-link"/></a></p></section>
						<section id="G3" class="indent-1"><p><span class="prefix-number">3.</span> Discharges from a <span class="dictionary">land-disturbing activity</span> to a sanitary sewer or a combined sewer system. <a id="paragraph-311721" class="section-permalink" href="https://vacode.org/62.1-44.15_34/#G3"><i class="fa fa-link"/></a></p></section></text><history>1989, cc. 467, 499, &#xA7; 10.1-603.8; 1994, cc. 605, 898; 2004, c. 372; 2011, c. 400; 2012, cc. 785, 819; 2013, cc. 756, 793; 2014, cc. 303, 598; 2016, cc. 68, 758; 2023, cc. 48, 49.</history><metadata></metadata></law>
