<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>73356</law_id><section_number>62.1-44.15:55</section_number><catch_line>Regulated land-disturbing activities; submission and approval of erosion and sediment control plan</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><referred_to_by><reference>62.1-44.15:55.1</reference><reference>62.1-44.15:58</reference><reference>62.1-44.15:58.1</reference><reference>62.1-44.15:63</reference><reference>62.1-44.15:65</reference><reference>62.1-44.3</reference></referred_to_by><structure><unit label="title" level="1" order_by="1" identifier="62.1">Waters of the State, Ports and Harbors</unit><unit label="chapter" level="2" order_by="1" identifier="3.1">State Water Control Law</unit><unit label="article" level="3" order_by="1" identifier="2.4">Erosion and Sediment Control Law for Localities Not Administering a Virginia Erosion and Stormwater Management Program</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> Except as provided in &#xA7; <a class="law" title="Standards and specifications for state agencies, federal entities, and other specified entities" href="/62.1-44.15_31/">62.1-44.15:31</a> for a <span class="dictionary">land-disturbing activity</span> conducted by a state agency, federal entity, or other specified entity, no <span class="dictionary">person</span> shall engage in any <span class="dictionary">land-disturbing activity</span> until (i) he has submitted to the <span class="dictionary">VESCP authority</span> an <span class="dictionary">erosion and sediment control plan</span> for the <span class="dictionary">land-disturbing activity</span> and the plan has been reviewed and approved and (ii) where Virginia Pollutant Discharge Elimination System permit coverage is required, the <span class="dictionary">VESCP authority</span> has obtained <span class="dictionary">evidence</span> of such permit coverage from the <span class="dictionary">Department</span>&#x2019;s online reporting system prior to issuing its <span class="dictionary">land-disturbance approval</span>. A <span class="dictionary">VESCP authority</span> may enter into an agreement with an adjacent VESCP or VESMP authority regarding the administration of multijurisdictional projects specifying who shall be responsible for all or part of the administrative procedures. Should adjacent authorities fail to come to such an agreement, each shall be responsible for administering the area of the multijurisdictional project that lies within its <span class="dictionary">jurisdiction</span>. Where the <span class="dictionary">land-disturbing activity</span> results from the construction of a (a) single-family residence or (b) <span class="dictionary">farm building or structure</span> on a parcel of land with a total impervious cover percentage, including the impervious cover from the <span class="dictionary">farm building or structure</span> to be constructed, of less than five percent, an <span class="dictionary">agreement in lieu of a plan</span> may be substituted for an <span class="dictionary">erosion and sediment control plan</span> if executed by the <span class="dictionary">VESCP authority</span>. <a id="paragraph-263974" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> The <span class="dictionary">VESCP authority</span> shall review <span class="dictionary">erosion and sediment control plans</span> submitted to it and grant written approval within 60 days of the receipt of the plan if it determines that the plan meets the requirements of this article and the <span class="dictionary">Board</span>&#x2019;s <span class="dictionary">regulations</span> and if the <span class="dictionary">person</span> responsible for carrying out the plan certifies that he will properly perform the erosion and sediment control measures included in the plan and shall comply with the provisions of this article. In addition, as a prerequisite to engaging in the land-disturbing activities shown on the approved plan, the <span class="dictionary">person</span> responsible for carrying out the plan shall provide the name of an individual holding a <span class="dictionary">certificate</span> to the <span class="dictionary">VESCP authority</span>, as provided by &#xA7; <a class="law" title="Virginia Erosion and Sediment Control Program" href="/62.1-44.15_52/">62.1-44.15:52</a>, who will be in charge of and responsible for carrying out the <span class="dictionary">land-disturbing activity</span>. However, any <span class="dictionary">VESCP authority</span> may <span class="dictionary">waive</span> the <span class="dictionary">certificate</span> requirement for an <span class="dictionary">agreement in lieu of a plan</span>. If a violation occurs during the <span class="dictionary">land-disturbing activity</span>, then the <span class="dictionary">person</span> responsible for carrying out the <span class="dictionary">agreement in lieu of a plan</span> shall correct the violation and provide the name of an individual holding a <span class="dictionary">certificate</span>, as provided by &#xA7; <a class="law" title="Virginia Erosion and Sediment Control Program" href="/62.1-44.15_52/">62.1-44.15:52</a>. Failure to provide the name of an individual holding a <span class="dictionary">certificate</span> prior to engaging in land-disturbing activities may result in <span class="dictionary">revocation</span> of the approval of the plan and the <span class="dictionary">person</span> responsible for carrying out the plan shall be subject to the penalties provided in this article.
			When a plan is determined to be inadequate, written notice of disapproval stating the specific reasons for disapproval shall be communicated to the <span class="dictionary">applicant</span> within 45 days. The notice shall specify the modifications, terms, and conditions that will permit approval of the plan. If no action is taken by the <span class="dictionary">VESCP authority</span> within the time specified in this subsection, the plan shall be deemed approved and the <span class="dictionary">person</span> authorized to proceed with the proposed activity. The <span class="dictionary">VESCP authority</span> shall act on any <span class="dictionary">erosion and sediment control plan</span> that has been previously disapproved within 45 days after the plan has been revised, resubmitted for approval, and deemed adequate. <a id="paragraph-263975" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#B"><i class="fa fa-link"/></a></p></section>
						<section id="C"><p><span class="prefix-number">C.</span> The <span class="dictionary">VESCP authority</span> may require changes to an approved plan in the following cases: <a id="paragraph-263976" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#C"><i class="fa fa-link"/></a></p></section>
						<section id="C1" class="indent-1"><p><span class="prefix-number">1.</span> Where inspection has revealed that the plan is inadequate to satisfy applicable <span class="dictionary">regulations</span>; or <a id="paragraph-263977" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#C1"><i class="fa fa-link"/></a></p></section>
						<section id="C2" class="indent-1"><p><span class="prefix-number">2.</span> Where the <span class="dictionary">person</span> responsible for carrying out the approved plan finds that because of changed circumstances or for other reasons the approved plan cannot be effectively carried out, and proposed amendments to the plan, consistent with the requirements of this article and associated <span class="dictionary">regulations</span>, are agreed to by the <span class="dictionary">VESCP authority</span> and the <span class="dictionary">person</span> responsible for carrying out the plan. <a id="paragraph-263978" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#C2"><i class="fa fa-link"/></a></p></section>
						<section id="D"><p><span class="prefix-number">D.</span> In <span class="dictionary">order</span> to prevent further erosion, a <span class="dictionary">VESCP authority</span> may require approval of an <span class="dictionary">erosion and sediment control plan</span> for any land identified by the <span class="dictionary">VESCP authority</span> as an <span class="dictionary">erosion impact area</span>. <a id="paragraph-263979" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#D"><i class="fa fa-link"/></a></p></section>
						<section id="E"><p><span class="prefix-number">E.</span> For the purposes of subsections A and B, when <span class="dictionary">land-disturbing activity</span> will be required of a contractor performing construction work pursuant to a construction <span class="dictionary">contract</span>, the preparation, submission, and approval of an <span class="dictionary">erosion and sediment control plan</span> shall be the responsibility of the <span class="dictionary">owner</span>. <a id="paragraph-263980" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#E"><i class="fa fa-link"/></a></p></section>
						<section id="F"><p><span class="prefix-number">F.</span> Notwithstanding any other provisions of this article, the following activities are not required to comply with the requirements of this article unless otherwise required by federal <span class="dictionary">law</span>: <a id="paragraph-263981" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#F"><i class="fa fa-link"/></a></p></section>
						<section id="F1" class="indent-1"><p><span class="prefix-number">1.</span> Disturbance of a land area of less than 10,000 square feet in size or less than 2,500 square feet in an area designated as a Chesapeake Bay Preservation Area pursuant to the Chesapeake Bay Preservation Act (&#xA7; <a class="law" title="Cooperative state-local program" href="/62.1-44.15_67/">62.1-44.15:67</a> et seq.). However, the governing body of the program authority may reduce this exception to a smaller area of disturbed land or qualify the conditions under which this exception shall apply; <a id="paragraph-263982" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#F1"><i class="fa fa-link"/></a></p></section>
						<section id="F2" class="indent-1"><p><span class="prefix-number">2.</span> <span class="dictionary">Minor</span> land-disturbing activities such as home gardens and individual home landscaping, repairs, and maintenance work; <a id="paragraph-263983" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#F2"><i class="fa fa-link"/></a></p></section>
						<section id="F3" class="indent-1"><p><span class="prefix-number">3.</span> Installation, maintenance, or repair of any individual service connection; <a id="paragraph-263984" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#F3"><i class="fa fa-link"/></a></p></section>
						<section id="F4" class="indent-1"><p><span class="prefix-number">4.</span> Installation, maintenance, or repair of any underground utility line when such activity occurs on an existing hard surfaced road, street, or sidewalk, provided the <span class="dictionary">land-disturbing activity</span> is confined to the area of the road, street, or sidewalk that is hard surfaced; <a id="paragraph-263985" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#F4"><i class="fa fa-link"/></a></p></section>
						<section id="F5" class="indent-1"><p><span class="prefix-number">5.</span> Installation, maintenance, or repair of any septic tank line or drainage field unless included in an overall plan for <span class="dictionary">land-disturbing activity</span> relating to construction of the building to be served by the septic tank system; <a id="paragraph-263986" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#F5"><i class="fa fa-link"/></a></p></section>
						<section id="F6" class="indent-1"><p><span class="prefix-number">6.</span> Permitted surface or deep mining operations and projects, or oil and gas operations and projects conducted pursuant to Title 45.2; <a id="paragraph-263987" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#F6"><i class="fa fa-link"/></a></p></section>
						<section id="F7" class="indent-1"><p><span class="prefix-number">7.</span> Clearing of lands specifically for bona fide agricultural purposes; the management, tilling, planting, or harvesting of agricultural, horticultural, or forest crops; livestock feedlot operations; agricultural engineering operations, including construction of terraces, terrace outlets, check dams, desilting basins, dikes, ponds, ditches, strip cropping, lister furrowing, contour cultivating, contour furrowing, land drainage, and land irrigation; or as additionally set forth by the <span class="dictionary">Board</span> in <span class="dictionary">regulations</span>. However, this exception shall not apply to harvesting of forest crops unless the area on which harvesting occurs is reforested artificially or naturally in accordance with the provisions of Chapter 11 (&#xA7; <a class="law" title="Department of Forestry; appointment of the State Forester" href="/10.1-1100/">10.1-1100</a> et seq.) of Title 10.1 or is converted to bona fide agricultural or improved pasture use as described in subsection B of &#xA7; <a class="law" title="Exemptions from article" href="/10.1-1163/">10.1-1163</a>; <a id="paragraph-263988" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#F7"><i class="fa fa-link"/></a></p></section>
						<section id="F8" class="indent-1"><p><span class="prefix-number">8.</span> Installation of fence and sign posts or telephone and electric poles and other kinds of posts or poles; <a id="paragraph-263989" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#F8"><i class="fa fa-link"/></a></p></section>
						<section id="F9" class="indent-1"><p><span class="prefix-number">9.</span> Shoreline erosion control projects on tidal waters when all of the land-disturbing activities are within the regulatory authority of and approved by local <span class="dictionary">wetlands</span> <span class="dictionary">boards</span>, the Marine Resources Commission, or the United States Army Corps of Engineers; however, any associated land that is disturbed outside of this exempted area shall remain subject to this article and the <span class="dictionary">regulations</span> adopted pursuant thereto; <a id="paragraph-263990" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#F9"><i class="fa fa-link"/></a></p></section>
						<section id="F10" class="indent-1"><p><span class="prefix-number">10.</span> Land-disturbing activities in response to a public emergency where the related work requires immediate authorization to avoid imminent endangerment to human health or the environment. In such situations, the VESMP authority shall be advised of the disturbance within seven days of commencing the <span class="dictionary">land-disturbing activity</span>, and compliance with the administrative requirements of subsection A is required within 30 days of commencing the <span class="dictionary">land-disturbing activity</span>; <a id="paragraph-263991" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#F10"><i class="fa fa-link"/></a></p></section>
						<section id="F11" class="indent-1"><p><span class="prefix-number">11.</span> Discharges to a sanitary sewer or a combined sewer system that are not from a <span class="dictionary">land-disturbing activity</span>; and <a id="paragraph-263992" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#F11"><i class="fa fa-link"/></a></p></section>
						<section id="F12" class="indent-1"><p><span class="prefix-number">12.</span> Repair or rebuilding of the tracks, rights-of-way, bridges, communication facilities, and other related structures and facilities of a railroad company. <a id="paragraph-263993" class="section-permalink" href="https://vacode.org/62.1-44.15_55/#F12"><i class="fa fa-link"/></a></p></section></text><history>1973, c. 486, &#xA7; 21-89.6; 1979, c. 432; 1988, cc. 732, 891, &#xA7; 10.1-563; 1993, c. 925; 1999, c. 555; 2001, c. 490; 2003, cc. 827, 966; 2006, c. 466; 2008, c. 23; 2011, cc. 720, 721; 2012, cc. 785, 819; 2013, cc. 756, 793; 2016, cc. 68, 758; 2023, cc. 48, 49; 2024, cc. 5, 104.</history><metadata></metadata></law>
