<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>58785</law_id><section_number>62.1-44.15:58</section_number><catch_line>Monitoring, reports, and inspections</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><referred_to_by><reference>62.1-44.15:63</reference></referred_to_by><structure><unit label="title" level="1" order_by="1" identifier="62.1">Waters of the State, Ports and Harbors</unit><unit label="chapter" level="2" order_by="1" identifier="3.1">State Water Control Law</unit><unit label="article" level="3" order_by="1" identifier="2.4">Erosion and Sediment Control Law for Localities Not Administering a Virginia Erosion and Stormwater Management Program</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> The <span class="dictionary">VESCP authority</span> (i) shall provide for periodic inspections of the <span class="dictionary">land-disturbing activity</span> and require that an individual holding a <span class="dictionary">certificate</span>, as provided by &#xA7; <a class="law" title="Virginia Erosion and Sediment Control Program" href="/62.1-44.15_52/">62.1-44.15:52</a>, will be in charge of and responsible for carrying out the <span class="dictionary">land-disturbing activity</span> and (ii) may require monitoring and reports from the <span class="dictionary">person</span> responsible for carrying out the <span class="dictionary">erosion and sediment control plan</span>, to ensure compliance with the approved plan and to determine whether the measures required in the plan are effective in controlling erosion and sediment. However, any <span class="dictionary">VESCP authority</span> may <span class="dictionary">waive</span> the <span class="dictionary">certificate</span> requirement for an <span class="dictionary">agreement in lieu of a plan</span>. The <span class="dictionary">owner</span> shall be given notice of the inspection. When the <span class="dictionary">VESCP authority</span> or the <span class="dictionary">Board</span> determines that there is a failure to comply with the conditions of <span class="dictionary">land-disturbance approval</span> or to obtain an approved plan or a <span class="dictionary">land-disturbance approval</span> prior to commencing <span class="dictionary">land-disturbing activity</span>, the <span class="dictionary">VESCP authority</span> or the <span class="dictionary">Board</span> may serve a notice to comply upon the <span class="dictionary">owner</span> or <span class="dictionary">person</span> responsible for carrying out the <span class="dictionary">land-disturbing activity</span>. Such notice to comply shall be served by delivery by facsimile, e-mail, or other technology; by mailing with confirmation of delivery to the address specified in the plan or land-disturbance application, if available, or in the land records of the locality; or by delivery at the site to a <span class="dictionary">person</span> previously identified to the <span class="dictionary">VESCP authority</span> by the <span class="dictionary">owner</span>. The notice to comply shall specify the measures needed to comply with the <span class="dictionary">land-disturbance approval</span> conditions or shall identify the plan approval or <span class="dictionary">land-disturbance approval</span> needed to comply with this article and shall specify a reasonable time within which such measures shall be completed. In any instance in which a required <span class="dictionary">land-disturbance approval</span> has not been obtained, the <span class="dictionary">VESCP authority</span> or the <span class="dictionary">Board</span> may require immediate compliance. In any other case, the <span class="dictionary">VESCP authority</span> or the <span class="dictionary">Board</span> may establish the time for compliance by taking into account the risk of damage to natural resources and other relevant factors. Notwithstanding any other provision in this subsection, a <span class="dictionary">VESCP authority</span> or the <span class="dictionary">Board</span> may count any days of noncompliance as days of violation should the <span class="dictionary">VESCP authority</span> or the <span class="dictionary">Board</span> take an enforcement action. The issuance of a notice to comply by the <span class="dictionary">Board</span> shall not be considered a case decision as defined in &#xA7; <a class="law" title="Definitions" href="/2.2-4001/">2.2-4001</a>. Upon failure to comply within the time specified, any plan approval or <span class="dictionary">land-disturbance approval</span> may be revoked and the <span class="dictionary">VESCP authority</span> or the <span class="dictionary">Board</span> may pursue enforcement as provided by &#xA7; <a class="law" title="Penalties, injunctions and other legal actions" href="/62.1-44.15_63/">62.1-44.15:63</a>. <a id="paragraph-215408" class="section-permalink" href="https://vacode.org/62.1-44.15_58/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> Notwithstanding the provisions of subsection A, a <span class="dictionary">VESCP authority</span> is authorized to enter into agreements or <span class="dictionary">contracts</span> with <span class="dictionary">districts</span>, adjacent localities, or other public or private entities to assist with the responsibilities of this article, including but not limited to the review and determination of adequacy of <span class="dictionary">erosion and sediment control plans</span> submitted for land-disturbing activities as well as monitoring, reports, inspections, and enforcement. <a id="paragraph-215409" class="section-permalink" href="https://vacode.org/62.1-44.15_58/#B"><i class="fa fa-link"/></a></p></section>
						<section id="C"><p><span class="prefix-number">C.</span> Upon issuance of an inspection report denoting a violation of this section or &#xA7; <a class="law" title="Regulated land-disturbing activities; submission and approval of erosion and sediment control plan" href="/62.1-44.15_55/">62.1-44.15:55</a>, in conjunction with or subsequent to a notice to comply as specified in subsection A, a <span class="dictionary">VESCP authority</span> or the <span class="dictionary">Board</span> may <span class="dictionary">issue</span> a stop work <span class="dictionary">order</span> requiring that all or part of the land-disturbing activities on the site be stopped until the specified corrective measures have been taken or, if land-disturbing activities have commenced without an approved plan as provided in &#xA7; <a class="law" title="Regulated land-disturbing activities; submission and approval of erosion and sediment control plan" href="/62.1-44.15_55/">62.1-44.15:55</a>, requiring that all of the land-disturbing activities be stopped until an approved plan is obtained. When such an <span class="dictionary">order</span> is issued by the <span class="dictionary">Board</span>, it shall be issued in accordance with the procedures of the Administrative Process Act (&#xA7; <a class="law" title="Short title; purpose" href="/2.2-4000/">2.2-4000</a> et seq.). Where the alleged noncompliance is causing or is in imminent danger of causing harmful erosion of lands or sediment <span class="dictionary">deposition</span> in waters within the watersheds of the Commonwealth, or where the land-disturbing activities have commenced without an approved <span class="dictionary">erosion and sediment control plan</span>, such a stop work <span class="dictionary">order</span> may be issued whether or not the alleged violator has been issued a notice to comply as specified in subsection A. Otherwise, such an <span class="dictionary">order</span> may be issued only after the alleged violator has failed to comply with a notice to comply. The <span class="dictionary">order</span> for noncompliance with a plan shall be served in the same manner as a notice to comply, and shall remain in effect for seven days from the date of service pending application by the <span class="dictionary">VESCP authority</span>, the <span class="dictionary">Board</span>, or alleged violator for appropriate relief to the <span class="dictionary">circuit</span> <span class="dictionary">court</span> of the <span class="dictionary">jurisdiction</span> wherein the violation was alleged to have occurred or other appropriate <span class="dictionary">court</span>. The stop work <span class="dictionary">order</span> for disturbance without an approved plan shall be served upon the <span class="dictionary">owner</span> by mailing with confirmation of delivery to the address specified in the land records of the locality, shall be posted on the site where the disturbance is occurring, and shall remain in effect until such time as plan approvals are secured, except in such situations where an agricultural exemption applies. If the alleged violator has not obtained an approved <span class="dictionary">erosion and sediment control plan</span> within seven days from the date of service of the stop work <span class="dictionary">order</span>, the <span class="dictionary">Board</span> or the chief administrative officer or his designee on behalf of the <span class="dictionary">VESCP authority</span> may <span class="dictionary">issue</span> a subsequent <span class="dictionary">order</span> to the <span class="dictionary">owner</span> requiring that all construction and other work on the site, other than corrective measures, be stopped until an approved <span class="dictionary">erosion and sediment control plan</span> has been obtained. The subsequent <span class="dictionary">order</span> shall be served upon the <span class="dictionary">owner</span> by mailing with confirmation of delivery to the address specified in the plan or the land records of the locality in which the site is located. The <span class="dictionary">owner</span> may <span class="dictionary">appeal</span> the issuance of any <span class="dictionary">order</span> to the <span class="dictionary">circuit</span> <span class="dictionary">court</span> of the <span class="dictionary">jurisdiction</span> wherein the violation was alleged to have occurred or other appropriate <span class="dictionary">court</span>. Any <span class="dictionary">person</span> violating or failing, neglecting, or refusing to obey an <span class="dictionary">order</span> issued by the <span class="dictionary">Board</span> or the chief administrative officer or his designee on behalf of the <span class="dictionary">VESCP authority</span> may be compelled in a proceeding instituted in the <span class="dictionary">circuit</span> <span class="dictionary">court</span> of the <span class="dictionary">jurisdiction</span> wherein the violation was alleged to have occurred or other appropriate <span class="dictionary">court</span> to obey same and to comply therewith by <span class="dictionary">injunction</span>, mandamus, or other appropriate remedy. Upon completion and approval of corrective action or obtaining an approved plan, the <span class="dictionary">order</span> shall immediately be lifted. Nothing in this section shall prevent the <span class="dictionary">Board</span> or the chief administrative officer or his designee on behalf of the <span class="dictionary">VESCP authority</span> from taking any other action specified in &#xA7; <a class="law" title="Penalties, injunctions and other legal actions" href="/62.1-44.15_63/">62.1-44.15:63</a>. <a id="paragraph-215410" class="section-permalink" href="https://vacode.org/62.1-44.15_58/#C"><i class="fa fa-link"/></a></p></section></text><history>1973, c. 486, &#xA7; 21-89.8; 1986, c. 328; 1988, cc. 694, 891, &#xA7; 10.1-566; 1992, c. 298; 1993, c. 925; 2001, c. 490; 2003, c. 827; 2012, cc. 249, 785, 819; 2013, cc. 756, 793; 2016, cc. 68, 758; 2023, cc. 48, 49.</history><metadata></metadata></law>
