<?xml version="1.0"?>
<law><site_title>Virginia Decoded</site_title><site_url>https://vacode.org</site_url><law_id>76513</law_id><section_number>62.1-44.34:15</section_number><catch_line>Oil discharge contingency plans</catch_line><edition url="https://vacode.org/2025/" slug="2025" current="TRUE" last_updated="">2025</edition><referred_to_by><reference>45.2-1646</reference><reference>62.1-44.34:17</reference><reference>62.1-44.34:20</reference><reference>62.1-44.34:21</reference></referred_to_by><structure><unit label="title" level="1" order_by="1" identifier="62.1">Waters of the State, Ports and Harbors</unit><unit label="chapter" level="2" order_by="1" identifier="3.1">State Water Control Law</unit><unit label="article" level="3" order_by="1" identifier="11">Discharge of Oil Into Waters</unit></structure><text>
						<section id="A"><p><span class="prefix-number">A.</span> No <span class="dictionary">operator</span> shall cause or permit the operation of a <span class="dictionary">facility</span> in the Commonwealth unless an <span class="dictionary">oil</span> <span class="dictionary">discharge</span> contingency plan applicable to the <span class="dictionary">facility</span> has been filed with and approved by the <span class="dictionary">Board</span>. No <span class="dictionary">operator</span> shall cause or permit a <span class="dictionary">tank vessel</span> to transport or transfer <span class="dictionary">oil</span> in <span class="dictionary">state waters</span> unless an <span class="dictionary">oil</span> <span class="dictionary">discharge</span> contingency plan applicable to the <span class="dictionary">tank vessel</span> has been filed with and approved by the <span class="dictionary">Board</span> or a vessel response plan applicable to the <span class="dictionary">tank vessel</span> and approved by the U.S. Coast Guard, pursuant to &#xA7; 4202 of the federal <span class="dictionary">Oil</span> <span class="dictionary">Pollution</span> Act of 1990. <a id="paragraph-274667" class="section-permalink" href="https://vacode.org/62.1-44.34_15/#A"><i class="fa fa-link"/></a></p></section>
						<section id="B"><p><span class="prefix-number">B.</span> Application for approval of an <span class="dictionary">oil</span> <span class="dictionary">discharge</span> contingency plan shall be made to the <span class="dictionary">Board</span> and shall be accompanied by plans, specifications, maps and such other relevant information as may be required, in scope and detail satisfactory to the <span class="dictionary">Board</span>. An <span class="dictionary">oil</span> <span class="dictionary">discharge</span> contingency plan must conform to the requirements and <span class="dictionary">standards</span> determined by the <span class="dictionary">Board</span> to be necessary to ensure that the applicant can take such steps as are necessary to protect environmentally sensitive areas, to respond to the threat of an <span class="dictionary">oil</span> <span class="dictionary">discharge</span>, and to contain, clean up and mitigate an <span class="dictionary">oil</span> <span class="dictionary">discharge</span> within the shortest feasible time. Each such plan shall provide for the use of the best available technology at the time the plan is submitted for approval. The applicant shall notify the <span class="dictionary">Board</span> immediately of any significant change in the operation or capacity of or the type of product dealt in, stored, handled, transported or transferred in or by any <span class="dictionary">facility</span> or vessel covered by the plan that will necessitate a change in the plan and shall update the plan periodically as required by the <span class="dictionary">Board</span>, but in no event more frequently than once every 36 months. The <span class="dictionary">Board</span>, on a <span class="dictionary">finding</span> of need, may require an <span class="dictionary">oil</span> <span class="dictionary">discharge</span> exercise designed to demonstrate the <span class="dictionary">facility</span>&#x2019;s or vessel&#x2019;s ability to implement its <span class="dictionary">oil</span> <span class="dictionary">discharge</span> contingency plan either before or after the plan is approved. <a id="paragraph-274668" class="section-permalink" href="https://vacode.org/62.1-44.34_15/#B"><i class="fa fa-link"/></a></p></section>
						<section id="C"><p><span class="prefix-number">C.</span> The <span class="dictionary">Board</span>, after notice and opportunity for a conference pursuant to &#xA7;&#xA0;<a class="law" title="Informal fact finding proceedings" href="/2.2-4019/">2.2-4019</a>, may modify its approval of an <span class="dictionary">oil</span> <span class="dictionary">discharge</span> contingency plan if it determines that: <a id="paragraph-274669" class="section-permalink" href="https://vacode.org/62.1-44.34_15/#C"><i class="fa fa-link"/></a></p></section>
						<section id="C1" class="indent-1"><p><span class="prefix-number">1.</span> A change has occurred in the operation of any <span class="dictionary">facility</span> or vessel covered by the plan that necessitates an amended or supplemented plan; <a id="paragraph-274670" class="section-permalink" href="https://vacode.org/62.1-44.34_15/#C1"><i class="fa fa-link"/></a></p></section>
						<section id="C2" class="indent-1"><p><span class="prefix-number">2.</span> The <span class="dictionary">facility</span>&#x2019;s or vessel&#x2019;s <span class="dictionary">discharge</span> experience or its inability to implement its plan in an <span class="dictionary">oil</span> <span class="dictionary">discharge</span> exercise demonstrates a necessity for modification; or <a id="paragraph-274671" class="section-permalink" href="https://vacode.org/62.1-44.34_15/#C2"><i class="fa fa-link"/></a></p></section>
						<section id="C3" class="indent-1"><p><span class="prefix-number">3.</span> There has been a significant change in the best available technology since the plan was approved. <a id="paragraph-274672" class="section-permalink" href="https://vacode.org/62.1-44.34_15/#C3"><i class="fa fa-link"/></a></p></section>
						<section id="D"><p><span class="prefix-number">D.</span> The <span class="dictionary">Board</span>, after notice and opportunity for <span class="dictionary">hearing</span>, may revoke its approval of an <span class="dictionary">oil</span> <span class="dictionary">discharge</span> contingency plan if it determines that: <a id="paragraph-274673" class="section-permalink" href="https://vacode.org/62.1-44.34_15/#D"><i class="fa fa-link"/></a></p></section>
						<section id="D1" class="indent-1"><p><span class="prefix-number">1.</span> Approval was obtained by <span class="dictionary">fraud</span> or misrepresentation; <a id="paragraph-274674" class="section-permalink" href="https://vacode.org/62.1-44.34_15/#D1"><i class="fa fa-link"/></a></p></section>
						<section id="D2" class="indent-1"><p><span class="prefix-number">2.</span> The plan cannot be implemented as approved; or <a id="paragraph-274675" class="section-permalink" href="https://vacode.org/62.1-44.34_15/#D2"><i class="fa fa-link"/></a></p></section>
						<section id="D3" class="indent-1"><p><span class="prefix-number">3.</span> A term or condition of approval has been violated. <a id="paragraph-274676" class="section-permalink" href="https://vacode.org/62.1-44.34_15/#D3"><i class="fa fa-link"/></a></p></section></text><history>1990, c. 917; 2004, c. 276.</history><metadata></metadata></law>
