This is the 2026 edition of the code. There is not the current edition. Browse all editions.

§ 33.2-413 When larger spillway required

In case the earthen portion of a dam has been washed away and it is determined by the Commissioner of Highways that the washout was caused by a spillway of insufficient opening to carry floodwater, the dam shall not be restored for the purpose of impounding water unless the owner or occupier agrees with the Commissioner of Highways to the construction of a spillway with adequate opening, conforming to plans and specifications of the Department. In the event that such construction is required, the Commissioner of Highways shall be responsible for such part of the cost as would be necessary to provide a bridge with sufficient opening to carry the floodwater of the stream, and the owner or occupier of the dam shall be required to pay the difference in cost, if any, of providing adequate floodgates and spillways in addition to the bridge.

History

The record of this law’s original creation isn’t available online. It has been modified 2 times. Those modifications are cataloged by “The Acts of Assembly,” a state publication, by year and chapter. Those modifications that can be read on the General Assembly’s website will be linked accordingly. Those modifications are as follows: in 1970, chapter 322; in 2014, chapter 805.

Code 1950, § 33-94; 1970, c. 322, § 33.1-180; 2014, c. 805.

Download